2015-16 Report on Plans and Priorities
Supplementary Information Tables
Parks Canada Agency’s 2015-16 Departmental Sustainable Development Strategy
1. Overview of the Federal Government's Approach to Sustainable Development
The Federal Sustainable Development Strategy (FSDS) 2013–16 guides the Government of Canada's sustainable development activities, as required by the Federal Sustainable Development Act. In keeping with the objectives of the Act to make environmental decision making more transparent and accountable to Parliament, the Parks Canada Agency supports the implementation of the FSDS through the activities in this supplementary information table.
This Departmental Sustainable Development Strategy (DSDS) presents the planned contributions and expected results for Theme I - Addressing Climate Change and Air Quality, Theme III - Protecting Nature and Canadians, and Theme IV - Shrinking the Environmental Footprint - Beginning with Government.
2. Themes I to III: Department and Agency-Led Targets
FSDS Goal | FSDS Performance Indicators | FSDS Target |
---|---|---|
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians | Ecological Integrity of national parks | Target 4.4: Improving the Health of National Parks - Improve the condition of at least one ecological integrity indicator in 20 national parks by 2015 Note: Since target 4.4 was set to be achieved by March 2015, it will not be part of the planning exercise for the 2015-16 DSDS. The final results of this target will be reported in the Agency's 2014-15 DSDS report and the 2015 FSDS Progress Report. |
3. Themes I-III: Implementation Strategies
Theme I: Addressing Climate Change and Air Quality
Target 1.2: Climate Change Adaptation
Implementation Strategy |
---|
1.2.9: Improve understanding of climate-driven ecological change in Canada's North by using a combination of remote sensing and working with park cooperative management boards to assess how ecological integrity and traditional land use may be affected by climate-driven changes in northern national parks. |
Link to FSDS 2013-16 Goals and Targets |
Theme I: Addressing Climate Change and Air Quality |
Goal 1: Climate Change - In order to mitigate the effects of climate change, reduce greenhouse gas emission levels and adapt to unavoidable impacts. |
Target 1.2: Climate Change Adaptation: Facilitate reduced vulnerability of individuals, communities, regions and economic sectors to the impacts of climate change through the development and provision of information and tools. |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program 1.2: Heritage Places Conservation |
Sub Program 1.2.1: National Park Conservation |
Description of the Implementation Strategy |
Parks Canada contributes to the understanding of climate-driven ecological change in Canada's North by consulting with park co-operative management boards, conducting process-based ecosystem mapping, and completing scenarios modeling and reporting, to help communities understand the risks to important country food, recognize the need for adaptation, and discuss options for action. Parks Canada also links key drivers to changing ecosystem composition and structure and discusses how these changes might impact other ecosystem components (such as caribou and other species) and the ecological integrity of parks. This activity supports communities in assessing the risks as well as opportunities arising from climate change, and provides them with options for adapting. |
Expected Results |
The expected outcome for the program is that potential impacts of climate-driven ecological change on park ecological integrity and traditional lifestyles are reduced because co-operative management boards for all Arctic national parks will have a knowledge system in place that provides relevant and timely information on park ecological change to facilitate proactive decision making. |
Performance Indicator |
Ecotype mapping for Quttinirpaaq and Sirmilik national parks will be completed. |
Planned Spending for 2015-16 |
Total of planned spending for 2015-16: $410,000 |
Theme III: Protecting Nature and Canadians
Target 4.1: Species at Risk
Implementation Strategy |
---|
4.1.9: Develop action plans for all protected areas with five or more species at risk by March 2016. |
Link to FSDS 2013-16 Goals and Targets |
Theme III: Protecting Nature and Canadians |
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians: Resilient ecosystems with healthy wildlife populations so Canadians can enjoy benefits from natural spaces, resources and ecological services for generations to come. |
Target 4.1: Species at Risk: By 2020, populations of species at risk listed under federal law exhibit trends that are consistent with recovery strategies and management plans. |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program 1.2: Heritage Places Conservation |
Sub Program 1.2.1: National Park Conservation |
Description of the Implementation Strategy |
Over half of Canada's endangered and threatened species can be found in the protected heritage areas administered by Parks Canada. Parks Canada protects these species and their critical habitat in the Agency's heritage areas, and supports their recovery by leading the development and implementation of recovery strategies and action plans, surveying and monitoring their status, implementing conservation and restoration projects, and facilitating public awareness and stewardship activities. Recovery planning is an obligation under the Species at Risk Act. |
Expected Result |
Management actions result in improvements to ecological integrity in national parks. |
Performance Indicator |
Number of action plans for national parks with 5 or more species at risk. |
Target 4.3: Terrestrial Ecosystem and Habitat Stewardship
Implementation Strategy |
---|
4.3.13: Make demonstrable progress on a yearly basis towards establishing national parks in one unrepresented region. |
Link to FSDS 2013-16 Goals and Targets |
Theme III: Protecting Nature and Canadians |
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians: Resilient ecosystems with healthy wildlife populations so Canadians can enjoy benefits from natural spaces, resources and ecological services for generations to come. |
Target 4.3: Terrestrial Ecosystem and Habitat Stewardship: Contribute to the proposed national target that by 2020, at least 17% of terrestrial areas and inland water are conserved through networks of protected areas and other effective area-based conservation measures. |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program 1.1: Heritage Places Establishment |
Sub Program 1.1.1: National Park Establishment |
Description of the Implementation Strategy |
This strategy entails the establishment of at least one national park in each of Canada's 39 natural regions, in accordance with the National Parks System Plan. The completion of the system will protect representative examples of Canada's natural diversity, and provide opportunities for Canadians to experience, understand and appreciate these places. Five steps are involved in the process to establish a national park: identify areas representative of a natural region; select an optimum national park candidate from the list of representative areas; assess the feasibility of establishing the proposed park through studies and consultations; negotiate new park agreements, including any that may be required with Aboriginal peoples or organizations; and formally establish the national park in legislation. |
Expected Result |
National parks are created in unrepresented regions. |
Performance Indicator |
Number of unrepresented regions with demonstrable progress towards establishing national parks. |
Implementation Strategy |
---|
4.3.14: Increase the number of represented terrestrial natural regions from 28 in March 2012 to 30 of 39 by March 2015. |
Link to FSDS 2013-16 Goals and Targets |
Theme III: Protecting Nature and Canadians |
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians: Resilient ecosystems with healthy wildlife populations so Canadians can enjoy benefits from natural spaces, resources and ecological services for generations to come. |
Target 4.3: Terrestrial Ecosystem and Habitat Stewardship: Contribute to the proposed national target that by 2020, at least 17% of terrestrial areas and inland water are conserved through networks of protected areas and other effective area-based conservation measures. |
Implementation Strategy completed in 2014-15 |
Since this Implementation Strategy was set to be achieved by March 2015, it will not be part of the planning exercise for the 2015-16 DSDS. The final results of this target will be reported in the Agency's 2014-15 DSDS Report and the 2015 FSDS Progress Report. |
Target 4.4: Improving the Health of National Parks
Implementation Strategy |
---|
4.4.1: 80% of active management targets to improve ecological integrity are met by March 2015. |
Link to FSDS 2013-16 Goals and Targets |
Theme III: Protecting Nature and Canadians |
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians: Resilient ecosystems with healthy wildlife populations so Canadians can enjoy benefits from natural spaces, resources and ecological services for generations to come. |
Target 4.4: Improving the Health of National Parks: Improve the condition of at least one Ecological Integrity Indicator in 20 national parks by 2015. |
Implementation Strategy completed in 2014-15 |
Since this Implementation Strategy was set to be achieved by March 2015, it will not be part of the planning exercise for the 2015-16 DSDS. The final results of this target will be reported in the Agency's 2014-15 DSDS Report and the 2015 FSDS Progress Report. |
Target 4.5: Marine Ecosystems
Implementation Strategy |
---|
4.5.6: Make demonstrable progress on a yearly basis towards establishing national marine conservation areas in two unrepresented regions. |
Link to FSDS 2013-16 Goals and Targets |
Theme III: Protecting Nature and Canadians |
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians: Resilient ecosystems with healthy wildlife populations so Canadians can enjoy benefits from natural spaces, resources and ecological services for generations to come. |
Target 4.5: Marine Ecosystems: By 2020, 10% of coastal and marine areas are conserved through networks of protected areas and other effective area-based conservation measures. |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program 1.1: Heritage Places Establishment |
Sub Program 1.1.2: National Marine Conservation Area Establishment |
Description of the Implementation Strategy |
This strategy aims to establish at least one national marine conservation area in each of Canada's 29 marine regions, in accordance with the National Marine Conservation Areas System Plan. The expansion and completion of the system will conserve representative examples of the diversity of Canada's oceans and Great Lakes, and provide opportunities for Canadians to experience, understand and appreciate these places. Five steps are involved in the process to establish a national marine conservation area: identify areas representative of a marine region; select an optimum national marine conservation area candidate from the list of representative areas; assess the feasibility of establishing the proposed marine conservation area through studies and consultations, including the development of an interim management plan; negotiate new national marine conservation area agreements, including any that may be required with Aboriginal peoples or organizations; and formally establish the national marine conservation area in legislation. |
Expected Result |
National marine conservation areas are created in unrepresented regions. |
Performance Indicator |
Number of unrepresented regions with demonstrable progress towards establishing national marine conservation areas. |
Target 4.7: Environmental Disasters, Incidents and Emergencies
Implementation Strategy |
---|
4.7.4: In accordance with mandated responsibilities, provide environmental and/or other information to reduce the risk of, and advice in response to, the occurrence of events such as polluting incidents, wildlife disease events or severe weather and other significant hydro-meteorological events as applicable. |
Link to FSDS 2013-16 Goals and Targets |
Theme III: Protecting Nature and Canadians |
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians: Resilient ecosystems with healthy wildlife populations so Canadians can enjoy benefits from natural spaces, resources and ecological services for generations to come. |
Target 4.7: Environmental Disasters, Incidents and Emergencies: Environmental disasters, incidents and emergencies are prevented or their impacts mitigated. |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program: Internal Services |
Description of the Implementation Strategy |
Finalize and implement a Strategic Emergency Management Plan to outline how the Agency assists in the response to environmental emergencies. |
Note: Under the lead of Public Safety Canada, Parks Canada Agency supports the implementation of this strategy with Agriculture and Agri-Food Canada (AAFC), Aboriginal Affairs and Northern Development Canada (AANDC), Department of Fisheries and Oceans (DFO), Environment Canada (EC), Health Canada (HC), Industry Canada (IC), Natural Resources Canada (NRCan), Public Works and Government Services Canada (PWGSC), and Transport Canada (TC).
Target 4.8: Chemicals Management
Implementation Strategy |
---|
4.8.1: Implement the Federal Contaminated Sites Action Plan and complete remediation and risk management activities at known high priority federal contaminated sites. |
Link to FSDS 2013-16 Goals and Targets |
Theme III: Protecting Nature and Canadians |
Goal 4: Conserving and Restoring Ecosystems, Wildlife and Habitat, and Protecting Canadians: Resilient ecosystems with healthy wildlife populations so Canadians can enjoy benefits from natural spaces, resources and ecological services for generations to come. |
Target 4.8: Chemicals Management: Reduce risks to Canadians and impacts on the environment and human health posed by releases of harmful substances. |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program 1.2: Heritage Places Conservation |
Description of the Implementation Strategy |
Parks Canada is responsible for 474 sites currently registered in the Federal Contaminated Sites Inventory. With funding from the Federal Contaminated Sites Action Plan, the Agency undertakes risk reduction activities (through remediation and/or risk management) at its high-priority contaminated sites. |
Expected Result |
Mitigate risks to the environment and human health. |
Performance Indicator |
Number of contaminated sites where risk to the environment and/or human health has been assessed and/or reduced. |
Note: Under the lead of Environment Canada (EC), Parks Canada Agency collaborates with other federal departments and agencies, including Agriculture and Agri-Food Canada (AAFC), Aboriginal Affairs and Northern Development Canada (AANDC), Correctional Service of Canada (CSC), Department of Fisheries and Oceans (DFO), Department of National Defense (DND), National Research Council (NRC), Public Works and Government Services Canada (PWGSC), Royal Canadian Mounted Police (RCMP), and Transport Canada (TC) to implement this strategy.
4. Theme IV: Targets and Implementation Strategies
Goal 6: Greenhouse Gas (GHG) Emissions and Energy
Target 6.1: GHG Emissions Reduction
The Government of Canada will reduce greenhouse gas emissions from its buildings and fleets by 17% below 2005 levels by 2020.
Departmental Target | |
---|---|
10.1% below 2005 by 2020 | |
Scope and Context | |
Targeted emissions include GHG emissions from energy consumed by facilities and fleet owned and operated by Parks Canada. | |
Link to Department's Program Alignment Architecture | |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. | |
Program: Internal Services | |
Performance Measurement | |
Expected result | |
Reduce the carbon footprint and energy consumption of federal operations. | |
Performance indicator | Targeted performance level |
Updated GHG reduction implementation plan in place by March 31, 2015. | The Parks Canada Master Plan for the Reduction of Greenhouse Gas Emissions will be updated by March 31, 2015 and will outline strategies to improve the energy efficiency of the fleet and facilities, implement the use of renewable fuels and renewable energy systems, and engage employees. |
GHG emissions (kt CO2 equivalent) in fiscal year 2005–06. | 39.1 kt |
GHG emissions (kt CO2 equivalent) in fiscal year 2015−16. | 37.1 kt |
Renewable power emission credits applied in current fiscal year (kt CO2 equivalent). | 0 kt |
Percentage change in GHG emissions from fiscal year 2005–06 to fiscal year 2015−16, inclusive of renewable power emission credits, if applicable. | -5.12% |
Adjustments made to base year GHG emissions. | The Department's base year GHG emission levels (fiscal year 2005-06) have been recalculated using emission factors from the latest electricity intensity tables published by Environment Canada. These factors, which are used to calculate the Department's emissions from purchased electricity, have been updated due to changes in Environment Canada's methodology for quantifying emissions from electricity generation in Canada. |
Goal 7: Waste and Asset Management
Target 7.1: Real Property Environmental Performance
As of April 1, 2014, and pursuant to departmental Real Property Sustainability Frameworks, an industry-recognized level of high environmental performance will be achieved in Government of Canada real property projects and operations.
Scope and Context | |
---|---|
Existing buildings with area greater than 1,000 square metres and new construction building projects over $1M with area greater than 1,000 square metres. | |
Link to Department's Program Alignment Architecture | |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. | |
Program: Internal Services | |
Performance Measurement | |
Expected result | |
An industry-recognized level of high-environmental performance will be achieved in Government of Canada real property projects and operations. | |
Performance indicator | Targeted performance level |
A Real Property Sustainability Framework in place to improve the management of energy, waste, and water in departmental real property assets by March 31, 2015. | Parks Canada will have its Real Property Sustainability Framework in place by March 31, 2015. |
Total number of existing Crown-owned buildings (over 1000 m2) and new lease or lease renewal projects (over 1000 m2) where the Crown is the major lessee, assessed for environmental performance using an industry‑recognized assessment tool, and associated floor space (m2). | 21 Crown-owned buildings 42,840 m2 |
0 new lease or lease renewal projects 0 m2 | |
Planned assessment tool to be used: Building Owners and Managers Association Building Environmental Standards (BOMA BESt) Practices. | |
Total number of existing Crown-owned buildings, new construction, build-to-lease and major renovation projects achieving an industry-recognized level of high‑environmental performance, and associated floor space (m2). | 0 Crown-owned buildings 0 m2 |
0 new construction projects 0 m2 | |
0 build-to-lease projects 0 m2 | |
0 major renovation projects 0 m2 | |
Planned environmental performance level to be achieved: Leadership in Energy and Environmental Design (LEED) Gold. | |
Number of fit-up and refit projects achieving an industry-recognized level of high-environmental performance. | 0 fit-up and refit projects 0 m2 |
Planned environmental performance level to be achieved: LEED Silver. | |
Implementation strategy element or best practice | Targeted performance level |
7.1.1.1. Achieve a level of performance that meets or exceeds the custodian's current commitment(s) to sustainable buildings using industry-recognized assessment and verification tool(s). | Parks Canada is seeking to reach "Achieved" status. |
7.1.1.2. Conduct life-cycle assessments for major construction and renovation projects using an industry-recognized tool. | Parks Canada is seeking to reach "Achieved" status. |
7.1.1.3. Develop plans to address environmental performance assessment recommendations for existing Crown-owned buildings. | Parks Canada is seeking to reach "Achieved" status. |
7.1.1.4. Manage the collection, diversion and disposal of workplace waste in Crown- owned buildings in an environmentally responsible manner. |
Parks Canada is seeking to reach "Achieved" status. |
7.1.1.5. Manage construction, renovation and demolition waste in Crown-owned buildings in an environmentally responsible manner. | Parks Canada is seeking to reach "Achieved" status. |
7.1.1.7. Develop an approach to training for building operators in Crown-owned buildings. | Parks Canada is seeking to reach "Achieved" status. |
Target 7.2: Green Procurement
As of April 1, 2014, the Government of Canada will continue to take action to embed environmental considerations into public procurement, in accordance with the federal Policy on Green Procurement.
Link to Department's Program Alignment Architecture | |
---|---|
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. | |
Program: Internal Services | |
Performance Measurement | |
Expected result | |
Environmentally responsible acquisition, use, and disposal of goods and services. | |
Performance indicator | Targeted performance level |
Departmental approach to further the implementation of the Policy on Green Procurement in place as of April 1, 2014. | Parks Canada had this departmental approach in place as of April 1, 2014. |
Number and percentage of procurement and/or materiel management specialists who have completed the Canada School of Public Service Green Procurement course (C215) or equivalent, in the given fiscal year. | 23 of 25 92% |
Number and percentage of managers and functional heads of procurement and materiel whose performance evaluation includes support and contribution toward green procurement, in the given fiscal year. | 6 of 6 100% |
Departmental green procurement target | |
As of March 31, 2017, 75% of vehicles purchased annually will be selected from the Parks Canada Preauthorized Vehicle List. | |
Performance indicator | Targeted performance level |
Percentage of vehicles purchased that were on the Parks Canada Preauthorized Vehicle List. | 75% of vehicles purchased Parks Canada is seeking to reach "Achieved" status. |
Departmental green procurement target | |
As of March 31, 2017, 95% of printers, photocopiers, and multi-functional devices will have environmental features such as duplex printing capability or automatic shutoff mode. | |
Performance indicator | Targeted performance level |
Number of printers, photocopiers, and multifunctional devices purchased or leased that has an environmental feature relative to total number purchased. | 95% of printers, photocopiers, and multifunctional devices purchased or leased. Parks Canada is seeking to reach "Achieved" status. |
Departmental green procurement target | |
As of March 31, 2017, 100% of office computers will have a minimum lifespan of three years, to reduce electronic waste. | |
Performance indicator | Targeted performance level |
Average service life of office computers. | 100% of office computers Parks Canada is seeking to reach "Achieved" status. |
Implementation strategy element or best practice | Targeted performance level |
7.2.1.5. Leverage common use procurement instruments where available and feasible. | Parks Canada is seeking to reach "Achieved" status. |
Best Practice 7.2.3. Train acquisition cardholders on green procurement. |
Parks Canada is seeking to reach "Achieved" status. |
Best Practice 7.2.4. Increase awareness of the Policy on Green Procurement among managers. |
Parks Canada is seeking to reach "Achieved" status. |
Target 7.3: Sustainable Workplace Operations
As of April 1, 2015, the Government of Canada will update and adopt policies and practices to improve the sustainability of its workplace operations.
Link to Department's Program Alignment Architecture | |
---|---|
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. | |
Program: Internal Services | |
Performance Measurement | |
Expected result | |
Departmental workplace operations have a reduced environmental impact. | |
Performance indicator | Targeted performance level |
An approach to maintain or improve the sustainability of the departmental workplace in place by March 31, 2015. | Parks Canada will implement a strategy which outlines this approach to maintain or improve the sustainability of the workplace by March 31, 2015. |
Implementation strategy element or best practice | Targeted performance level |
7.3.1.1. Engage employees in greening government operations practices. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.2. Integrate environmental considerations into corporate policies, processes, and practices in accordance with departmental refresh cycles. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.3. Maintain or improve existing approaches to sustainable workplace practices (i.e., printer ratios, paper usage, and green meetings). | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.4. Minimize the ratio of information technology (IT) assets per employee. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.5. Select and operate IT and office equipment in a manner that reduces energy consumption and material usage. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.6. Dispose of e-waste in an environmentally sound and secure manner. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.7. Reuse or recycle workplace materiel and assets in an environmentally sound and secure manner. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.8. Minimize all non-hazardous solid waste generated and leverage service offerings to maximize the diversion of waste. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.9. Increase the population density in office buildings and space utilization in special purpose buildings. | Parks Canada is seeking to reach "Achieved" status. |
7.3.1.10. Maintain or improve sustainable fleet management. | Parks Canada is seeking to reach "Achieved" status. |
Goal 8: Water Management
Target 8.1: Water Management
As of April 1, 2014, the Government of Canada will take further action to improve water management within its real property portfolio.
Scope and Context | |
---|---|
Existing buildings with area greater than 1,000 square metres and new construction building projects over $1M with area greater than 1,000 square metres. | |
Link to Department's Program Alignment Architecture | |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. | |
Program: Internal Services | |
Performance Measurement | |
Expected result | |
Water is managed sustainably in Government of Canada real property operations. | |
Performance indicator | Targeted performance level |
Approach to improving water management included in Real Property Sustainability Framework by March 31, 2015. | Parks Canada's Real Property Sustainability Framework, including an approach to improving water management, will be in place by March 31, 2015. |
Amount and percentage of floor space in buildings over 1000 m2 that includes water metering, in the given fiscal year (where feasible). | 0 m2 0% |
0 m2 new Crown built-to-lease 0% | |
0 m2 major renovations 0% | |
0 m2 leases 0% | |
Implementation strategy element or best practice | Targeted performance level |
8.1.1.1. Conserve potable water. | Parks Canada is seeking to reach "Achieved" status. |
8.1.1.2. Manage storm water run-off. | Parks Canada is seeking to reach "Achieved" status. |
8.1.1.4. Meter the water usage in new projects. | Parks Canada is seeking to reach "Achieved" status. |
5. Additional Agency Sustainable Development Activities and Initiatives
In addition to its core implementation strategies, Parks Canada contributes to sustainable development through additional activities such as the engagement of Canadians through stakeholder and partner relationships and visitor experiences.
Stakeholder and Partner Engagement
Activity |
---|
Parks Canada will provide increased opportunities for Canadians to be involved with Parks Canada places in activities they consider meaningful and relevant. |
Link to FSDS 2013-16 Themes |
Theme III: Protecting Nature and Canadians |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program 1.3 Heritage Places Promotion and Public Support |
Sub Program 1.3.2: Partnering and Participation |
Description of the Program |
This program encourages the participation of partners and stakeholders and leads to new or expanded opportunities for Canadians to discover and develop a sense of connection to their protected heritage places. Partnering arrangements advance shared or complimentary goals and objectives, and result in a wide range of collaborative activities including program delivery, promotional campaigns, contests, scientific and academic research, learning tools and new products. Partners include private sector organizations as well as other government departments, NGO's, academic institutions, and Aboriginal peoples, who in a number of places co-manage national heritage places. Stakeholders engage with Parks Canada through a wide variety of activities such as the Minister's Round Table, formal and informal consultation processes, and the national volunteer program. Stakeholders include individuals, groups and organizations that have an interest in Parks Canada and ensure that Canadians' needs and priorities are clearly expressed and inform Parks Canada's actions and direction. |
Expected Result |
Stakeholders and partners are engaged in the protection and presentation of Parks Canada's administered places. |
Performance Indicator |
|
Visitor Experience
Activity |
---|
Parks Canada will facilitate a diverse range of opportunities in Parks Canada's protected heritage places for visitors to learn about, experience, and enjoy the spirit, wonder, and awe of Canada's network of heritage places. |
Link to FSDS 2013-16 Themes |
Theme III: Protecting Nature and Canadians |
Link to Parks Canada Program Alignment Architecture |
Strategic Outcome: Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals, and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Program 1.4: Visitor Experience |
Description of the Program |
This program fosters opportunities for Canadians and international visitors to discover, experience, enjoy and develop a sense of personal connection to Canada's national urban park, national parks, national historic sites administered by Parks Canada, national marine conservation areas, and heritage canals. This program includes a range of activities, services and products associated with pre-visit planning, the on-site visit, and post visit communications. It includes tourism marketing, trip planning information, reception, orientation, interpretation, recreation, special events, merchandise, compliance and visitor safety services, and visitor facilities. The program is supported by market and visitor analytics, trend analysis, and performance measurement. |
Expected Result |
Canadians and International visitors visit Parks Canada's administered places and visitors at surveyed locations feel a sense of connection to these places. |
Performance Indicators |
|
6. Sustainable Development Management System
Parks Canada Sustainable Development Vision
The Federal Sustainable Development Act defines sustainable development as development that meets the needs of the present without compromising the ability of future generations to meet their needs. It states that the Government of Canada "acknowledges the need to integrate environmental, economic and social factors in the making of all decisions by government."
Sustainable development is central to Parks Canada's mandate and vision. It is ingrained in all aspects of the Agency's activities from establishing and conserving national parks and national marine conservation areas to designating and commemorating national historic sites. Parks Canada is committed to ensuring that Canada's treasured natural and historic places remain unimpaired for the understanding, appreciation and enjoyment of present and future generations.
Parks Canada activities also contribute to the Canadian economy. The combined annual expenditures of Parks Canada and its millions of visitors make a substantial and widespread contribution to the Canadian economy, both directly through its facilities, locations and services, and indirectly in the surrounding communities through spending on accommodations, restaurants, and other tourism-related businesses. Parks Canada protected heritage places are significant economic drivers, with a contribution of over $3.3 billion annually to the Canadian economy, and to more than 400 communities across Canada, many in remote and rural areas.
Managing Sustainable Development
Sustainable development involves the consideration of environmental, economic and social objectives in the development and implementation of public policies and programs. The needs of the present as well as future generations are also taken into consideration. Integrated decision-making and a long-term approach to planning are defining characteristics of sustainable development.
Parks Canada takes an integrated approach in managing its heritage places. For example, Parks Canada carries out conservation and restoration projects in national parks. These projects are designed in a manner that ensures the conservation of natural resources, while enhancing visitor experiences and engaging key audiences with a view to connecting Canadians to their heritage places. This integrated approach to the delivery of Parks Canada's mandate has strengthened the Agency's contribution to all aspects of sustainable development - environmental, social and economic.
Parks Canada's decision making and sustainable development practices include collaborating with groups that share its values and have an interest in its work. The establishment of national parks and national marine conservation areas, for example, requires a high level of engagement on the part of provincial governments and Aboriginal peoples. The designation and commemoration of persons, places and events of historic significance equally demand the active participation of stakeholders, partners and community groups. The Agency recognizes that building and maintaining these collaborative relationships is essential to achieving its mandate of protecting and presenting Canada's natural and cultural heritage.
Moreover, Parks Canada promotes sustainable development practices by encouraging the use of analytical techniques that compare and integrate environmental, social, and economic objectives and that address multi-year or long-term concerns. For example, the Agency uses social science analytical and performance measurement tools to understand and engage Canadians, particularly certain segments of the population (e.g. urban, youth, new Canadians), in meaningful ways to ensure that its heritage places remain relevant for present and future generations.
Finally the Agency is engaged in several interdepartmental initiatives related to sustainable development, such as the Clean Air Agenda, Species at Risk, Federal Contaminated Sites, and Greening Government Operations.
7. Strategic Environmental Assessment
Parks Canada Agency will continue to ensure that its decision-making process includes consideration of the FSDS goals and targets through the Strategic Environmental Assessment (SEA) process. A SEA for policy, plan or program proposals includes an analysis of the impacts of the given proposal on the environment, including on the FSDS goals and targets. The results of Parks Canada Agency's strategic environmental assessment are made public when an initiative is announced. The purpose of the public statement is to demonstrate that the environmental effects, including the impacts on achieving the FSDS goals and targets, of the approved policy, plan or program have been appropriately considered during proposal development and decision making.
Details on Transfer Payment Programs (TPP) of $5 Million or More
Name of transfer payment program | General Class Contribution Program (GCCP) |
---|---|
Start date | 1995-96 |
End date | Ongoing |
Fiscal year for terms and conditions | 2010-11 |
Strategic Outcome | Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
Link to department's Program Alignment Architecture | Program 1.1: Heritage Places Establishment; Program 1.2: Heritage Places Conservation; Program 1.3: Heritage Places Promotion and Public Support; Program 1.4: Visitor Experience; Program 1.5 Heritage Canals, Highways and Townsite Management; and Internal Services. |
Description | The objective of the program is to assist recipients in conducting activities and delivering projects that will support the Agency in fulfilling its mandate to preserve and protect nationally significant examples of Canada's natural and cultural heritage and present and foster public understanding, appreciation and enjoyment in ways that ensure the ecological and commemorative integrity of these places for present and future generations. |
Expected results |
|
Fiscal year of last completed evaluation | 2010-11 |
Decision following the results of last evaluation | Continuation |
Fiscal year of planned completion of next evaluation | 2015-16 |
General targeted recipient groups | N/A |
Initiatives to engage applicants and recipients | N/A |
Forecast Spending 2014–15 ($) | Planned Spending ($) | |||
---|---|---|---|---|
2015–16 | 2016–17 | 2017–18 | ||
Total grants | 6,272,700 | 9,272,700 | 6,272,700 | 22,700 |
Total contributions | 5,822,436 | 3,708,175 | 3,689,300 | 3,689,300 |
Total transfer payments | 12,095,136 | 12,980,875 | 9,962,000 | 3,712,000 |
Disclosure of Transfer Payment Programs (TPP) Under $5 Million
Name of TPP | Programs and Sub-Programs | Main Objective | End Date of TPP, if applicable | Type of TP (Grant or Contribution) | Planned Spending for 2015-16 | Fiscal Year of Last Completed Evaluation | General Targeted Recipient Group |
---|---|---|---|---|---|---|---|
Grant to the International Peace Garden | Program 1.2: Heritage Places Conservation Sub-Program 1.2.5: Other Heritage Places Conservation | To help defray the costs of operating the International Peace Garden | N/A | Grant | $22,700 | 2010-11 | Non-profit organizations |
Grant to Qikiqtani Inuit Association (QIA) | Program 1.1: Heritage Places Establishment Sub-Program 1.1.1: National Park Establishment | To support creating spin-off economic activities related to national park establishment in Inuit communities | N/A | Grant | $3,000,000 | N/A | Aboriginal groups |
National Historic Sites Cost Sharing Class Contribution Program | Program 1.2: Heritage Places Conservation Sub-Program 1.2.5: Other Heritage Places Conservation | To conduct activities aimed at ensuring the commemorative integrity of non-federally owned or administered national historic sites | N/A | Contribution | $1,000,000 | 2012-13 | Non-profit organizations, other levels of government and aboriginal groups |
Upcoming Internal Audits and Evaluations Over the Next Three Fiscal Years
A. Internal audits
Title of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Point of Sale (POS) System | Financial management controls | Planning phase | December 2015 |
Business Continuity and Emergency Preparedness | Internal controls | Planning phase | September 2015 |
Key Financial and Administrative Processes (Two audit reports - Field Units to be determined) | Financial management controls | Planned | March 2016 |
Realty Data and Obligations Management | Internal and financial management controls | Planned | March 2016 |
Official Languages | Human resources | Planned | March 2016 |
Project Management | Internal controls | Planned | March 2016 |
Revenue collected by third party | Internal and financial management controls | Planned | September 2016 |
Key Financial and Administrative Processes (Two audit reports - Field Units to be determined) | Financial management controls | Planned | September 2016 and March 2017 |
Investment Planning | Internal controls | Planned | March 2017 |
Reservation system | Internal and financial management controls | Planned | March 2017 |
Information Management | Internal controls | Planned | March 2017 |
Compliance with Organizational Design Requirements | Internal controls / human resources | Planned | March 2017 |
B. Evaluations
Link to Departmental Program Alignment Architecture | Title of the Evaluation | Planned Evaluation Start Date | Planned Deputy Head Approval Date |
---|---|---|---|
Program 1.2 - Heritage Places Conservation | Law Enforcement | December 2014 | May 2015 |
Sub-Program 1.5.1 - Townsite Management | Townsites Management | January 2015 | December 2015 |
Sub-Program 1.2.4 - National Historic Site Conservation | National Historic Sites Conservation | March 2015 | March 2016 |
Sub-Program 1.3.1 - Heritage Places Promotion | Heritage Places Promotion | September 2015 | September 2016 |
Program 1.4 - Visitor Experience | Visitor Safety | September 2015 | September 2016 |
Sub-Program 1.1.2 - National Marine Conservation Area Establishment, Sub-Program 1.2.3 - National Marine Area Conservation | National Marine Conservation Area Establishment and Conservation | April 2016 | March 2017 |
Across all programs | General Class Contribution Program | April 2016 | March 2017 |
Sub-Program 1.3.2 - Partnering and Participation | Partnering and Participation | September 2017 | September 2018 |
Sub-Program 1.5.2 - Highway Management | Highway Management | September 2017 | September 2018 |
Sub-Program 1.2.2 - National Urban Park Conservation | National Urban Park Conservation | April 2017 | March 2018 |
Sub-Program 1.5.3 - Heritage Canal Management | Heritage Canal Management | April 2017 | March 2018 |
Sub-Program 1.2.5 - Other Heritage Places Conservation | National Historic Sites Cost-Sharing Program | April 2017 | March 2018 |
Program 1.4 - Visitor Experience | Visitor Experience | September 2017 | March 2019 |
Electronic link to evaluation plan: http://www.pc.gc.ca/docs/pc/rpts/rve-par/87/index_e.asp
Up-Front Multi-Year Funding
Strategic Outcome | Canadians have a strong sense of connection to their national parks, national historic sites, heritage canals and national marine conservation areas and these protected places are experienced in ways that leave them unimpaired for the enjoyment of present and future generations. |
---|---|
Link to department's Program Alignment Architecture | Program 1.3: Heritage Places Promotion and Public Support, Sub-program 1.3.2: Partnering and Participation |
Name of recipient | Trans Canada Trail Foundation (TCTF) http://tctrail.ca/ |
Start date | March 25, 2014 |
End date | April 30, 2017 |
Description | The Government of Canada through Parks Canada makes this grant to the Recipient solely for the purpose of supporting the recipient's fundraising efforts to complete the Trans Canada Trail by 2017. Parks Canada will pay the TCTF one dollar ($1) for every two dollars ($2) both raised and received from non-federal donors from April 1, 2013 to March 31, 2017. |
Total funding approved | $25,000,000 |
Total funding received | $9,274,120. Additional funds (up to $3,225,880) may be paid in 2014-15 as identified through fundraising efforts. |
Planned funding in 2015-16 | Estimate $6,250,000. Dependent on fundraising efforts of recipient. |
Planned funding in 2016-17 | Estimate $6,250,000. Dependent on fundraising efforts of recipient. |
Planned funding in 2017-18 | N/A |
Summary of annual plans of recipient | Recipient will continue fundraising efforts so as to be in a position to complete the Trans Canada Trail by 2017. The TCTF will provide evidence of actual collection of cash donations in order to receive Parks Canada funding. |
User Fees and Regulatory Charges
Fee Name | Fee Type | Fee-setting authority | Reason for planned change of existing fee or introduction of new fee | Effective date of planned change | Consultation and review process planned |
---|---|---|---|---|---|
Entry Fees New and amended |
Other products and services | Parks Canada Agency Act | Adjustments to national pricing to keep pace with inflationary pressures on operational costs. | 2016-17 & 2017-18* | Following the January-February 2013 public consultations on Parks Canada's proposed new fees and fee increases, the Agency has halted the initiative and current visitor fees remain at 2008 rates, and commercial fees at 2009 rates. It is planned that Parks Canada will request concurrence to consult the Canadian public on new fees and adjustments to current fees in 2016. For the proposed 2016-17 (visitor fees) and 2017-18 (commercial fees) adjustments, Parks Canada will consult on two levels:
In both instances notice will be provided on the Parks Canada website on the proposals for price adjustments. A comparison of Parks Canada's proposed fees with those charged by parks organizations in Canada and other countries will be conducted. Pursuant to the User Fees Act, a national fee proposal would be tabled in Parliament in 2016-17 prior to being submitted to the Minister responsible for Parks Canada for enactment. To respect our commitment to provide 18 months advance notice, implementation of the proposed new business fees and commercial rates would be in 2017-18. |
Camping Fees Amend |
Other products and services | Parks Canada Agency Act | Adjustments to national pricing to keep pace with inflationary pressures on operational costs. | 2016-17 | |
Lockage Fees Amend |
Other products and services | Parks Canada Agency Act | Adjustments to national pricing to keep pace with inflationary pressures on operational costs. The fees were last increased in 2005. | 2016-17 | |
Recreation Fees New and amended |
Other products and services | Parks Canada Agency Act | Adjustments to national pricing to keep pace with inflationary pressures on operational costs. | 2016-17 | |
Fishing License Fees Amend |
Other products and services | Parks Canada Agency Act | To earn a fair return for the use of publicly owned resources. | 2016-17 | |
Business Licenses Amend |
Other products and services | Parks Canada Agency Act | To earn a fair return for the commercial use of publicly owned resources. The fees were previously increased in 1994. | 2017-18* |
* To respect our commitment to provide 18 months advance notice, implementation of proposed new business fees and commercial rates would be in 2017-18.
- Date modified :