Jones Falls Concrete Bridge Reconstruction
Rideau Canal National Historic Site
The rehabilitation of the Jones Falls Concrete Bridge is now complete.The project involved the demolition of the old bridge, which required the removal of portions of the concrete abutments, approach retaining walls, concrete deck and girders – the bridge support beams; and installation of a new bridge.
Using a 60 tonne crane, 15 ton slabs were dropped into their final resting place to create the concrete bridge’s superstructure. New concrete abutments and approach walls were placed behind the old ones and new parapets – protective curbs on the tops of the walls - were poured. Protective guardrails were then installed to complete the project.
Constructed in 1932, the concrete bridge provides a connection between the arch dam and the locks, and a means of access for maintenance and repairs of the locks. This project has increased the load capacity of the bridge to allow easier site access for service vehicles and will allow for construction equipment to gain access to the locks for repair and maintenance.
Investments in visitor infrastructure – such as the Jones Falls Concrete Bridge – will ensure the quality and reliability of visitor facilities and continue to allow Canadians to connect with nature.
About Jones Falls:
Work on Jones Falls began in 1827 and was completed in 1832. Given the rugged terrain, the Jones Falls lockstation demonstrates the impressive feats of the canal builders. In order to address the one mile long rapids with a fall of 60 feet, Colonel By proposed the construction of an arch dam 60 feet high and 350 feet in length. Four locks were constructed at the site, each with a lift of 15 feet. The upper lock and the flight of three lower locks are separated by a turning basin.
For More Information
For more information about the Rideau Canal Historic Site, contact us at rideau@pc.gc.ca or follow us on Facebook and Twitter @RideauCanalNHS.
Communications
March 24, 2017 - Community Update: Ongoing Work Update (PDF, 352 KB)
November 4, 2016 - Info-Work: Jones Falls Concrete Bridge Replacement (PDF, 171 KB)
Related links
- Old Slys Lock 26 and 27 Masonry Rehabilitation
- Poonamalie Dam Rehabilitation
- Newboro Lock 36 Masonry Repairs
- Rehabilitation of Combined Lock 29A and Smiths Falls Basin...
- Narrows Lock 35 Masonry Repairs
- Jones Falls Timber Bridge Replacement
- Rehabilitation of the Masonry at Jones Falls Locks and Arch...
- Date modified :